The Tunnel project.

All about Galmair and its Guilds. / Alles über Galmair und die Gilden in Galmair.

Moderators: Valerio Guilianni, Gamemasters

User avatar
Leena
Posts: 105
Joined: Wed May 08, 2013 9:15 pm
Location: Northern Ontario, Canada

Re: The Tunnel project.

Post by Leena »

the shovels are done now as well.
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

All that remains te be collected !


Galmairians we have almost reached the target amount te complete the tunnels resources,
a few more cut rocks and some pins an' cotters an we be done!
Please check the list above.

I have only the greatest admiration fer my fellow towns folk wot have given help wit' this mighty project.

Thank ye all,
Ufedhin Copperhand. Tunnel manager.
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

A cow ,a cow is needed!


I would suggest for the last of our tunnels work we capture a oxen (bull or cow) to carry our rock burdens,these animals are placid and very strong, capture and taming should be possible ,also this animal will be of great service in furture building projects.

I would very much like suggestions on this matter put up on this board.

Ufedhin Copperhand ,Tunnel manager.
Mr.Oldie
Posts: 351
Joined: Sun Dec 09, 2012 9:54 am

Re: The Tunnel project.

Post by Mr.Oldie »

A commonly used cow would be great. It could be tethered in the stables during off seasons when there be no work for it. A few bundles of grain would suffice to tame it or perhaps apples.. I've tried feeding a tamed one,named bessie, which pulled the cart of the fortune teller in cadomyr.. She responded well to the grass commonly found in the desert, so am sure another could very well be tamed by using the greener grass in galmair.
On the matter of finding them, i did see the wild ones to the north east.. in the forest and surrounded by spiders and wolfs and such.. a group of warriors could clear the way and bring in the wild one and then anyone capable of training and taming could do it in galmair

~Zzrracck"Purple"~

PS: Bulls are stronger, but more difficult to tame as some had been known to go wild and attack when people went near them. They might be able to carry more, but if anyone could tame it, it would be worthwhile.. i would even like to try a hand at taming it..
User avatar
Kyre
Posts: 1257
Joined: Thu Dec 24, 2009 4:44 pm
Contact:

Re: The Tunnel project.

Post by Kyre »

What can the lowly cow do but a little moo, they are so weighted down already they can barely move. Bears would be so much stronger, carrying a much heavier load and willing workers when briefly tamed with the right temptation. This noble beast will be able to help finish our tunnel project for a price. I am willing to coordinate this part of the project.

Kyre
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

I am returned, the tunnel shall continue an ' be soon finished!


Ufedhin, Tunnel manager.
User avatar
Kyre
Posts: 1257
Joined: Thu Dec 24, 2009 4:44 pm
Contact:

Re: The Tunnel project.

Post by Kyre »

I have a message from the Master Alchemist and Tunnel Manager, our great Ufedhin. It is very hard for him to send one... all his slimes die as a result and I am not sure I can get a message back to him but will try to let him know we are continuing the tunnel work.

He desires us to start trying to tame the bears for the last of the tunnel work so I would appreciate volunteers for this attempt. Anyone with experience with taming wild animals, possibly alchemy experience and mages are welcome to assist with research and advice. Hopefully by the time Ufedhin returns, we will be ready to have the bears finish the project and he can over-see the completion.

Kyre




(( Having trouble getting in game.. hoping he can eventually ))
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

Count me in ! i have prevailed..i will help catch a bear.

Ufedhin ,Tunnel manager.
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

The bear hunt

((time and date,10 pm cet ,friday 06 september))
13 findos ,year 40.
We shall meet at the tunnel mouth to hunt a suitable bear under the guidance of the Mage Kyre,the mage has determined that a great bear will work best to assist with speeding the tunnels completion.

I look forward to working with as many whom will assist in this endeavour.

Ufedhin Copperhand.
Last edited by Ufedhin on Thu Sep 05, 2013 8:31 am, edited 1 time in total.
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

((Bear hunt time updated))
User avatar
Leena
Posts: 105
Joined: Wed May 08, 2013 9:15 pm
Location: Northern Ontario, Canada

Re: The Tunnel project.

Post by Leena »

I plan to attend... the tunnel must be completed for the good of all of Galmair. Leena
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

Thank ye all fer the successful bear hunt , the bear will be a great asset te the work !

However there arr some among us with odd feelings about bears so the following rule applies


The elfs Leena and i think "Averal" or some such, have a temporary bann from entering the tunnel
due to the unfortunate fact they will cause mischief with the bear.

By order o' the Tunnel manger.Ufedhin Copperhand.

I caution any with plans to perform mischief in the tunnel or with the bear, that this will be taken very serious
and will be viewed as an act o' treason and sabotage against the town o' Galmair.
User avatar
Kyre
Posts: 1257
Joined: Thu Dec 24, 2009 4:44 pm
Contact:

Re: The Tunnel project.

Post by Kyre »

A parchment suddenly appears as if by magic...

As the official tamer of the bear named Eklob, I would like any that approach him to first discuss options with me. This does not include Sammy which may bring beer and tell more stories, nor Ufedhin, Jerem, Banduk, Oxi and Brawndara who helped to take him to his new home. Erin, Leena and Bart, I would like to talk to you at a later date.

Kyre
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

The Tunnel is completed ,
Labouring night and day and with the help of the bear the tunnel has been completed ahead of time, well done Galmair!
Galmair celebrate this huge achivement , wealth shall flow to our city as a river o' gold!

The grand opening ceremony shall take place on the 13 of olos year 40((10 pm cet this saterday 14th september))

All welcome to attend and celebrate the power, wealth and magisty of our fine towns acomplishment.

Ufedhin Copperhand ,Tunnel manager .

Rejoice in our new tunnel this is Galmairs triumph!
Last edited by Ufedhin on Sat Sep 14, 2013 9:15 pm, edited 1 time in total.
User avatar
Kyre
Posts: 1257
Joined: Thu Dec 24, 2009 4:44 pm
Contact:

Re: The Tunnel project.

Post by Kyre »

A small parchment is added with writing in red...

The bear has been lead back to his home yet keeps following us back..he won't even stay for the beer, honey or strawberries. It has been hypothesized he wishes to hear the stories.

Anyone wishing to discuss this development about the bear please contact me. As of now, he is roaming around Galmair looking presumably for a cave so be cautious of any caves you enter.

Kyre
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

The flat conection Tunnel begins.
Here i will post the designs fer this tunnel as i finish them.

This be the covered entance te the stair situated in the Dark Ally,all other details regarding the tunnel shall be attached here as they come te light.
Let us once again complete a project fer the glory o' Galmair .

Ufedhin Copperhand ,Tunnel Manager.
Attachments
Entry to Scoria Housing tunnel..jpg
Entry to Scoria Housing tunnel..jpg (51.72 KiB) Viewed 6037 times
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

Here be a rough plan o' the tunnel stair itsself.

Ufedhin Copperhand ,Tunnel Manager.
Attachments
Tunnel stairwell to Scoria flats.jpg
Tunnel stairwell to Scoria flats.jpg (129.21 KiB) Viewed 6000 times
User avatar
Manron
Posts: 476
Joined: Fri Dec 20, 2002 11:35 pm
Location: Vienna/Austria

Re: The Tunnel project.

Post by Manron »

Ufedhin my friend, do you really think we need another tunnel?
Look at the streets and the mountins in Galmair! We need to put the rocks away and make better streets for the trader. Maybe we make a roof on the market place that they dont get sick when it rains or for the food! Do you wanna eat some bread who breaks when you look at it because the rain makes it like this?

For me, we have to fix up the town infrastructure!

signed,
Manron
Mr.Oldie
Posts: 351
Joined: Sun Dec 09, 2012 9:54 am

Re: The Tunnel project.

Post by Mr.Oldie »

Renovations of the Galmair structers and pathways would start soon.
A Caretaker/ another title will be appointed for these purposes.

Ufedhin is the tunnel manager. And this tunnel very valuable for the further Developments in Galmair.
Let the current works carry on and the preparations for Mas as well as the siege be take n care of.
Tunnel and other renovations will take its due course n time to plan n finish.

~Zzrracck "Purple"~
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

Thank you,thank you for your input Manron and for the answer Purple,please feel free to contact me in person for any debate on the new tunnel,and keep this notice board free for the public works announcements.
These tasks i perform fer the greater good o' Galmair with Galmairians and at the behest of our Great Don.
On a personal note :why i would shift all o' Galmair underground if i could.


Ufedhin Copperhand ,Tunnel Manager.
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

A concept sketech fer the tunnel entrance /exit at the bottom chamber just on the right hand side before the bridge over te the flats,
Oh and a reminder te all our great smiths and miners the tunnel will most lik'y be sheathed in iron to assuage the Dons queasy feelings due to the tunnel passing close te" you know wot"

Looken forwards te Galmair worken tegether again fer our benifit.

Ufedhin Copperhand ,Tunnel Manager.
Attachments
lower chamber entrance.jpg
lower chamber entrance.jpg (17.5 KiB) Viewed 5899 times
User avatar
Ufedhin
Posts: 797
Joined: Mon Jun 11, 2012 5:45 am
Location: In a barrel with salted herrings.

Re: The Tunnel project.

Post by Ufedhin »

Dear Galmairians,
Now that we have capable chancellors in Galmair i have handed over tunnel management te the new Chancellor Zzrracck,
i would urge all Galmairians te support him as ye have done me ,fer the greater good o' Galmair.


Thank ye ,
Financier, Ufedhin Copperhand.
Mr.Oldie
Posts: 351
Joined: Sun Dec 09, 2012 9:54 am

Re: The Tunnel project.

Post by Mr.Oldie »

          • Flat entrance

With respect duly given to our dear ol' Ufedhin Copperhand's plans that were handed over to me; i 've assessed and estimated that the following things be needed:

The first figure is what has been collected the second is what is needed.
The name of the contributors would be added along with each thing and the amount contributed.
Iron ingots
1000///////////1000 Completed
:1000 Arcia

Fired bricks
1000///////////1000Completed
:500 Elysiel
:500 Snori Gunnarson

Naldor boards
500///////////500Completed
:500 Arcia

Conifer boards
500///////////500Completed
:500 Arcia

Bags
25///////////25Completed
:25 Zzrracck "Purple"

Hammers
25///////////25Completed
:25 Arcia

Pick-axes
20///////////20Completed
:20 Arcia

Hatchets
15///////////15Completed
:15 Arcia

Chisels
25///////////25Completed
:25 Arcia

Pins & Cotters
50///////////50Completed
:50 Arcia

Shovels
20///////////20Completed
:20 Arcia

Ropes
20///////////20Completed
:20 Zzrracck "Purple"

Black cloth
50///////////50Completed
:50 Zzrracck "Purple"

Yellow cloth
50///////////50Completed
:50 Zzrracck "Purple"
This will be updated often so please looks at this to see what is still required for the complete Tunnel build.

Tunneling downwards is going to be difficult and perilous.
So I would be accepting donations as well as volunteers to work towards this venture as soon as possible.


~Zzrracck "Purple"~
Last edited by Mr.Oldie on Fri Nov 01, 2013 2:39 am, edited 6 times in total.
Mr.Oldie
Posts: 351
Joined: Sun Dec 09, 2012 9:54 am

Re: The Tunnel project.

Post by Mr.Oldie »

To reply to the unnamed and unsigned Dove left for me,

All proceedings, donations and any help worth menitioning about the project would be put up here along with total.
Naming each and everyone along with the amount they supplied as material as well as through manual labour would be formulated as a list and submited to Don personally by me after the tunnel gets finished.

~Zzrracck "Purple"~
Snori
Posts: 3
Joined: Sun Oct 27, 2013 8:44 pm

Re: The Tunnel project.

Post by Snori »

I will be firing bricks for this. I have around 500 already completed.
Mr.Oldie
Posts: 351
Joined: Sun Dec 09, 2012 9:54 am

Re: The Tunnel project.

Post by Mr.Oldie »

The materials needed for the Flat-entrance have been gathered. After assessing the grounds for digging and finding the proper time depending on the weather condition the date will be decided and we'll start tunnelling.
~Zzrracck "Purple"~
Mr.Oldie
Posts: 351
Joined: Sun Dec 09, 2012 9:54 am

Re: The Tunnel project.

Post by Mr.Oldie »

Priorities have changed.
The tunneling for the flat entrance would be held up and moved back for some necessary and urgent repairs.
Further news and orders would be passed on as soon as possible.
Be vigilent!

~Zzrracck "Purple"~
Mr.Oldie
Posts: 351
Joined: Sun Dec 09, 2012 9:54 am

Re: The Tunnel project.

Post by Mr.Oldie »

*************************
Trails of blood could be seen from the copperhand tunnel to the well near the market.
Anyone who follows the tracks of paws n tail (which obiviously belong to a lizard) leading them to the remains of items left behind near a pile of rocks inside the tunnel could come to the conclusion that its the Chancellor Zzrracck "Purple" who was gravely hurt.
It might seem that the roof of the tunnel had come down on him during an inspection.

*************************
Mr.Oldie
Posts: 351
Joined: Sun Dec 09, 2012 9:54 am

Re: The Tunnel project.

Post by Mr.Oldie »

** the repair will start in 30 minutes**
Post Reply